Product details

Smart sound-light head, turn on the light, turn off the light, adjust the brightness, AI light head, compatible with all base sockets.

$ 7.20

sales volume:8


Product description
















Product description

  • Sensing Range: 10m
  • Load Power: 200
  • Delay Turn-off Time: Adjustable from 0 to 200 seconds
  • 3C Rated Voltage Range: 0-220V
  • Model: GB-0023

Product description

  • No data available

colour

GB-0023

size

Free Size

number - +

add to cart

Buy now