Product details

GBH18V-26 Bosch electric hammer impact drill multifunctional industrial grade concrete lithium battery rechargeable electric hammer brushless

$ 277.90

sales volume:7


Product description


















Product description

  • Model: GBH18V-26 [standard configuration: 2 batteries, 1 charger 6.0AH] including 13% VAT
  • Model: GBH18V-26 [standard configuration: 2 batteries and 1 charger] tax excluded
  • Model: GDE18V-16 dust collection device
  • Type: round handle, two pits and two slots
  • Rated voltage: 18
  • Single hammering force: 2.6
  • Single hammering force: 0
  • Single hammering force: 2.6J
  • Power supply type: Rechargeable - lithium battery technology
  • Weight (without cable): 3.6
  • Scope of application: 4-25mm
  • Voltage range: AC single-phase and DC 50V and below
  • Hammering frequency: 4350
  • Hammer frequency: 0
  • Whether with clutch: Yes
  • Electric drill type: hammer drill

Product description

  • No data available

colour

GBH18V-26 [standard configuration: 2 batteries, 1 charger 6.0AH] including 13% VAT
GBH18V-26 [standard configuration: 2 batteries and 1 charger] does not include tax
GDE18V-16 dust collection device

size

One size fits all

number - +

add to cart

Buy now